Uzbekistan Water supply and sanitation Project

From WaterWiki.net

Jump to: navigation, search

Project ID

00015505

Project Title

Uzbekistan Water supply and sanitation Project

Type

Water Supply and Sanitation

Focus Areas

Geographic Scope

Lead Organization(s)

Project Partners

*UNDP
  • Government of Uzbekistan

Financing

Total: $63,500;

Sources of Financing: UNDP Uzbekistan

Timeframe

1999 - 2007

Status

Ongoing

Project website(s)

Contacts

Contents

Description

The project is part of a wide-ranging package of projects prepared by the Government of Uzbekistan with IBRD assistance in support of the Aral Sea zone. It aims to improve water supply, health, and sanitation through developing safe drinking water facilities and managerial capacities.


Expected Project Outputs
  • 1) Provision of safe drinking water and sanitation facilities
  • 2) strengthening of the financial, operational, and managerial capacities of water supply and sanitation utilities.

Expected Outcomes

Achievements: Results and Impact

Lessons for Replication

TYPE LESSONS HERE

References

See also

  1. Water/Energy Dialogue
  2. Water Supply and Sanitation Services Investment Program – Project 1, Republic of Uzbekistan
  3. Water Sector Investment Planning Study
  4. Water Resources Management Project, Uzbekistan
  5. Water Productivity Improvement at Plot Level
  6. Water Governance in Central Asia
  7. Water Flume Metres for Water User Associations
  8. Water Conflict and Cooperation/Aral Sea Basin
  9. Uzbekistan WSS Strategy
  10. Uzbekistan Bukhara and Samarkand Sewerage Project
  11. UNEP Support Programm for CA Countries on Johannesburg Plan and IWRM Plan by 2005
  12. UNDP 2003: Water-related legal and institutional structures in Central Asia
  13. The Swiss Support to Hydro-meteorological Services in the Aral Sea basin Project
  14. Syr Darya Water Supply Project
  15. Shifting to hydrological boundaries – The politics of implementation in the lower Amu Darya Basin
  16. Setting up a Project Formulation and Coordination Support group for sustainable transboundary management of radioactive waste in Central Asia
  17. Rural Enterprise Support Project II
  18. Regional Rural Water Supply Project (SDC)
  19. Regional Research Network Water in Central Asia (CAWa)
  20. Regional Environment Programme
  21. Preparatory Assistance for IWRM in Uzbekistan
  22. Politics of Water in Post-Soviet Central Asia
  23. National Integrated Water Resources Management Plan for Uzbekistan
  24. National Integrated Water Resources Management (IWRM) and Efficiency Plan for Uzbekistan
  25. Microbiological safety of drinking water
  26. Lessons on Cooperation Building to Manage Water Conflicts in the Aral Sea Basin
  27. Irrigation and Poverty in Central Asia: A Field Assessment
  28. Integrated Water Resources Management Ferghana Valley
  29. Improved Management of Water Resources in Central Asia II
  30. IWRM in Uzbekistan
  31. Ferghana Valley Water Resources Management Phase-I
  32. Ferghana Valley Water Resource Management
  33. Enhancing regional exchange of water resource information (CAREWIB phase II)
  34. ENVSEC/UNEP - Environment & security assessment and capacity-building in the Amu-Darya river basin
  35. Drainage, Irrigation & Wetlands Improvement Project - Phase 1
  36. Dam safety in Central Asia: capacity building and sub-regional cooperation
  37. Cross Border Impacts of Vahksh River Basin Development
  38. Central Asia – Regional and National Water Sector Review
  39. Canal Automation in Ferghana Valley
  40. CAREWIB
  41. Bukhara & Samarquand Water Supply Project
  42. Atrof-Muhit Environment Programme Evaluation Report
  43. Aral Sea Basin Capacity Development Project
  44. Amu Darya Water Quality Assessment and Management
  45. Amu Darya Assessment of Environment and Security Linkages and Impact
  46. A comprehensive study on glacial melting in Central Asia

External Resources

Attachments

3639 Rating: 0.0/5 (0 votes cast)